
Add to Cart
High rise steel structure building for industry commercial application
Advantage |
Light weight: the strength of steel is high, under the same load, the steel structure is lighter than the concrete structure, reducing the burden of the foundation and foundation. |
Fast construction speed: steel structure components can be prefabricated in the factory, and the on-site installation efficiency is high, which shortens the construction period. |
Good seismic performance: The steel has good ductility, can absorb more energy in an earthquake, and has superior seismic performance. |
High space utilization: Steel structure can achieve large span design, reduce the number of columns, and provide more flexible use of space. |
Environmental protection and energy saving: The steel can be recycled, and the construction waste generated during the construction process is less, which is in line with the green building concept. |
Strong adaptability: Steel structure can adapt to complex terrain and climate conditions, suitable for a variety of building types. |
Application |
Office building: Multi-storey steel structure office building construction speed, high space utilization. |
Housing: Steel structure houses can achieve large span design and provide flexible spatial layout. |
Schools, hospitals: steel structure buildings have good seismic performance, suitable for densely populated public buildings. |
Commercial complex: Steel structure can achieve large space design, suitable for shopping malls, exhibition halls, etc. |
Checking Cost Of steel structure, Please Give Us The Information
(1) Dimension: Length, width, height, eave height, roof pitch, etc.
(2) Doors and windows: Dimension, quantity, position.
(3) Local climate: Wind speed, snow load, seismic magnitude etc.
(4) Insulation material: Panel type, sandwich materials, sandwich thickness
(5) crane metal structures: if have overhead crane, please tell the lifting height and lifting weight.
(6) Is there any materials that are not allowed to import to the country where the structure is planning to use?
(7) If you have other requirements, such as fire proofing, insulated roof, etc. Please also inform us.
(8) It's better if you have your own drawings or pictures. Please send them to us.
Packing and loading
Shipment via 20'/40'/40HC/40OT sea containers
*All steel structure weld components are carefully packed with blankets or bubble wrap to prevent scratches during loading and unloading.
*All steel structures components are consolidated in steel pallets within the container, optimizing loading and unloading time and labor costs.
*All sandwich panels are efficiently packed in steel pallets.
*Comprehensive container load plans and regional unloading plans are devised to avoid onsite retransportation.