Qingdao Yidongxiang Steel Structure Co., Ltd.

Qingdao Yidongxiang Steel Structure Co., Ltd.

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Steel Frame Building Construction /

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Contact Now
Qingdao Yidongxiang Steel Structure Co., Ltd.
Visit Website
City:qingdao
Province/State:shandong
Country/Region:china
Contact Person:MrSun
Contact Now

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Ask Latest Price
Video Channel
Brand Name :YDX
Model Number :YDX121
Certification :ISO,BV.SGS
Place of Origin :CHINA
MOQ :1TON
Price :USD760/TON
Payment Terms :L/C,T/T,Western Union,MoneyGram
Supply Ability :10000TON/MONTH
Delivery Time :25 DAYS
Packaging Details :Steel pallet
Construction Method :Steel structure
Material :Steel Q355B
Cost :Affordable
Sustainability :Eco-friendly
Maintenance :metal sheet or sandwich panels
Insulation :EPS,Glass wool,PU, Rock wook
Type :Frame Building
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Steel structure construction prefabricated food workshop packing warehouse

Number of floors, height, and area of the building: the first floor above ground in this project; The total height of the above ground buildings is 10.650m,

The first floor has a height of 10.50m; The building area is 20790.31 square meters.

Architectural structure form: adopting light steel structure, partial frame structure, and the design service life of the main structure

Limited to 50 years; The structural safety level is level 2, the seismic fortification intensity is 7 degrees, and the design earthquake grouping is:

The third group is designed with a basic acceleration of 0.10g.

Fire resistance rating: The above ground part has a fire resistance rating of level two.

The non load bearing walls of the steel structure are made of polyurethane composite flat steel plates, and the foundation beams of the exterior walls of the factory are raised to the elevation

Below 1.2m, it is a 200 thick aerated concrete block wall with gray exterior wall tiles. Elevation above 1.2m

The wall is composed of 100mm glass wool felt composite board and single-layer profiled steel plate. Outer layer composite

The outer panel of the wall panel is made of 0.7mm thick aluminum zinc coated profiled steel sheet, and the inner panel is made of 0.5mm thick aluminum zinc coated profiled steel sheet

Board. The inner panel of the wall is made of 0.5mm milky white profiled steel plate, which is installed on the inner side of the purlin.

Roof 2: Metal profiled sheet roof

1.0.6 thick HV-470 type 360 degree concealed buckle aluminum zinc outer layer pressed color steel plate (the outer surface of the roof is milky white)

Color)

2.100 thick pink ultra-fine steel structure special glass wool felt with aluminum foil veneer (bulk density not less than

16kg/m3, thermal conductivity not exceeding 0.037w/mk)

3. Hot dip galvanized cold-formed steel purlins

4.0.5mm 980 type galvanized pressed inner color steel plate (with a milky white surface)

Exterior Wall 3: Color steel plate exterior wall, used for exterior walls of steel structures over 1.2 meters

1.0.7mm thick aluminum zinc coated profiled steel sheet

2.100 thick pink ultra-fine steel structure special glass wool felt with aluminum foil veneer (bulk density not less than

16kg/m3, thermal conductivity not exceeding 0.037w/mk)

3. Hot dip galvanized cold-formed steel purlins

4.0.5mm thick aluminum zinc coated profiled steel sheet (indoor panel surface is milky white)

Standard

SGS,ISO, GB,CE

Material

Q345B(S235JR&S355JR)

Dimensions

According to the clients requirements

FOB Price

US $ 30 - 100 / Square Meter

Port of loading

Qingdao

Minimum Order(ton)

20 tons

Payment Terms

L/C,T/T

Quality Control

The third party ,SGS,ASIA INSPECTION all accept

Surface Treatment

Shot blasting with anti rust paint or hot dip galvanize

Delivery Term

Within 30 days after receiving deposit

Packaging

According yours requirement, usually bundle with steel strip

Our Experience

Have exported more than 25 years.

Roof ,Wall material

Color steel sheet or PU,EPS, Rock Wool sandwich panel

Window

PVC or Aluminum Alloy

Main steel Column and Beam

H section ,I section or Galvanized

Roof Purlin

C-Section and Z-section

Surface

2 primer and 1 finished paint

Local Climate

1.wind speed 2.Rain load 3.Snow load 4.Earthquake grade if have etc.

Crane parameter

If need crane beam, parameter is in need.

Package

standard packing or as request

Load in

20GP, 40GP, 40OT

After the laying is completed, find the rules for the anchor bolts. Strictly position according to the axis and elevation provided.

Find the rules: It is required that all anchor bolts are aligned and the steel columns are placed in a straight line.

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

When hoisting steel columns, the foundation nuts should be leveled in advance. During hoisting, no one is allowed to stand within the lifting range of the crane. After the steel columns are basically in place, people should install them. The anchor nut should be tightened.

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Lifting of steel beams after assembly: After the construction of steel column tie rods/column supports is completed, the steel beams will be lifted

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Tie rod connection between steel beams: must achieve bolt tightening and consistent direction

The roof steel beams use high-strength bolts and do not require welding.

Platform beams are divided into main beams and secondary beams: the main beams are generally welded, and the wing plates are welded. Secondary beams are generally not welded.

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Roof inner panel completed

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Finished photo

Food Workshop Q355B Steel Frame Building Construction Prefabricated Steel Packing Warehouse

Inquiry Cart 0